(866) 285-3647 | (866) cvl-engr

5M Associates, LLC
  • Home
  • About Us
  • Services
  • Projects
  • The Team
  • Blog
  • Contact Us
  • More
    • Home
    • About Us
    • Services
    • Projects
    • The Team
    • Blog
    • Contact Us
5M Associates, LLC

(866) 285-3647 | (866) cvl-engr


  • Home
  • About Us
  • Services
  • Projects
  • The Team
  • Blog
  • Contact Us

Projects

Current Projects

A look at the projects currently underway and the engineering solutions we are delivering for our clients and communities.

Stack of blue PVC pipes.

Bistone MWSD TWDB SWIFT Well Field

$16,000,000

Installation of five (5) new groundwater wells, an 18-inch transmission main, and 12-inch and 8-inch collection mains. 

Excavator digging a trench near a residential area.

Bruceville-Eddy 2023 CDBG Water Line

500,000

Installation of 2,200 feet of 6 inch water main.

Water flowing out of a concrete pipe into a rocky area.

Granger 2021 CDBG Lift Station & Wastewater Line

$800,000

Installation of a new package lift station and 21-inch, 18-inch, and 15-inch wastewater lines.

Blue binder labeled 'PERMITS' on a desk.

Granger WWTP Permit Modification

$8,000

Renewal and modification of the Wastewater Treatment Plant Discharge Permit.

Worker and truck at construction site with equipment.

Granger WWTP and Drainage Improvements

$18,000,000

Installation of a new Wastewater Treatment Plant, Oak St Culvert replacement, and Brazos St. Drainage Improvements 

Holland 2023 Transportation Alternatives

$1,700,000

 Replacement of concrete sidewalks along Travis St. from Front St. to Lexington St.

Holland Water Master Plan

$53,900

Surveying of water infrastructure and creation of a hydraulic model for the water system.  Development of Capital Improvements and budget. 

Holland Wastewater Master Plan Phase 1

$5,800

Identification of manholes and/or cleanouts for potential infiltration and inflow. 

Rosebud 2023 CDBG Water Line

$500,000

Installation of 2,500 feet of 6-inch water main.

Rosebud TWDB Drainage Improvements

$3,7000,000

Replacement of 3,000 feet of earthen channel with concrete channel and culverts. 


Past Projects

Explore our portfolio of completed projects and the engineering solutions we have delivered for communities throughout Central Texas. Our past work reflects our experience across water, wastewater, infrastructure, and community improvement projects, demonstrating our commitment to practical solutions, quality service, and lasting results.

Bistone MWSD Raw Water System Hydraulic Model

Coupland WSC Wastewater Treatment Plant Permit Renewal

Granger 2022 & 2023 CDBG Water Line Improvements

Granger Wastewater Master Plan

Holland TWDB AMPSS Wastewater System Mapping

Holland ARPA Water System Generator

Pendleton WSC Water System Master Plan

Add a footnote if this applies to your business

Copyright © 2026 5M Associates, LLC - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept