A look at the projects currently underway and the engineering solutions we are delivering for our clients and communities.

Installation of five (5) new groundwater wells, an 18-inch transmission main, and 12-inch and 8-inch collection mains.

Installation of 2,200 feet of 6 inch water main.

Installation of a new package lift station and 21-inch, 18-inch, and 15-inch wastewater lines.

Renewal and modification of the Wastewater Treatment Plant Discharge Permit.

Installation of a new Wastewater Treatment Plant, Oak St Culvert replacement, and Brazos St. Drainage Improvements

Replacement of concrete sidewalks along Travis St. from Front St. to Lexington St.

Surveying of water infrastructure and creation of a hydraulic model for the water system. Development of Capital Improvements and budget.

Identification of manholes and/or cleanouts for potential infiltration and inflow.

Installation of 2,500 feet of 6-inch water main.

Replacement of 3,000 feet of earthen channel with concrete channel and culverts.
Explore our portfolio of completed projects and the engineering solutions we have delivered for communities throughout Central Texas. Our past work reflects our experience across water, wastewater, infrastructure, and community improvement projects, demonstrating our commitment to practical solutions, quality service, and lasting results.







Add a footnote if this applies to your business
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.